Plan had been to get the official shop moved next weekend, but that seems like a very far way off. I knew the concrete floor was going to be a problem, but I never had the chance to place a laser level on it until tonight. I'm looking at about a 1.5-2" negative slope from the garage door into the back of the shop and upwards of a 3-4" slope left to right. As I'm having to now place custom sleepers in the deeper areas, the placement of the panels is taking much longer than planned.